def get_critical_path(activities, nodes, edges):
    p = Node('Activity')
    links = []
    p.add(Node(activities[0].activity_name, duration=activities[0].duration))

    for i in range(1, len(activities)):
        p.add(
            Node(activities[i].activity_name,
                 duration=activities[i].duration,
                 lag=0))

    for act in activities:
        if act.no_of_predecessors != 0:
            if len(act.predecessors_string) > 1:
                for pred in act.predecessors:
                    links.append((pred, act.activity_name))
            else:
                links.append((act.predecessors_string, act.activity_name))

    for lk in links:
        if lk[0] != ' ':
            p.link(lk[0], lk[1])

    p.update_all()
    print("Critical Path = ", p.get_critical_path())
    print("Critical Path Duration = ", p.duration)
    return p.get_critical_path(), p.duration
Exemple #2
0
    def test_model_small(self):

        p = Node('project')

        times = pd.read_csv(os.path.join(BASE_DIR, 'fixtures/timings.dsv'),
                            delimiter='|',
                            dtype={'PROC_ID': str})
        deps = pd.read_csv(os.path.join(BASE_DIR, 'fixtures/deps_small.dsv'),
                           delimiter='|',
                           dtype={
                               'PARENT_ID': str,
                               'UPROC_ID': str
                           })

        # Define nodes with timings
        for utiming in times.itertuples(index=False):
            p.add(Node(utiming.PROC_ID, duration=utiming.DURATION))

        # Add dependencies to the model
        for dep in deps.itertuples(index=False):
            while True:
                try:
                    p.link(dep.PARENT_ID, dep.UPROC_ID)
                    break
                except KeyError as missingnode:
                    print('Missing node when adding dependency = ')
                    print(missingnode)
                    print(dep)
                    for errordep in dep:
                        p.add(Node(errordep, duration=0))
        p.update_all()
        critical_path = p.get_critical_path()
        print(critical_path)
Exemple #3
0
    def test_model_big(self):
        """
        A very large graph that tests the CPU and memory efficiency of our cyclic checker.
        """

        p = Node(name='project')

        times = pd.read_csv(os.path.join(BASE_DIR, 'fixtures/timings.dsv'), delimiter='|', dtype={'PROC_ID': str})
        deps = pd.read_csv(os.path.join(BASE_DIR, 'fixtures/deps_big.dsv'), delimiter='|', dtype={'PARENT_ID': str, 'UPROC_ID': str})

        # Define nodes with timings
        for utiming in times.itertuples(index=False):
            p.add(Node(name=utiming.PROC_ID, duration=utiming.DURATION))

        # Add dependencies to the model
        for dep in deps.itertuples(index=False):
            while True:
                try:
                    p.link(dep.PARENT_ID, dep.UPROC_ID)
                    break
                except KeyError as missingnode:
                    print('Missing node when adding dependency = ')
                    print(missingnode)
                    print(dep)
                    for errordep in dep:
                        p.add(Node(errordep, duration=0))
        p.update_all()
        critical_path = p.get_critical_path()
        print(critical_path)
Exemple #4
0
 def calc_critical_path(self, project):
     task_nodes = {}
     project_node = Node('project')
     tasks = self.env['project.task'].search([('project_id', '=',
                                               project.id)])
     for task in tasks:
         Project.node_link(project_node, task_nodes, task)
     project_node.update_all()
     return [n.name for n in project_node.get_critical_path()]
Exemple #5
0
 def getPath(self):
     project = get_object_or_404(Project, pk=self.pk)
     p = Node(project.name)
     task = Task.objects.all()
     for t in task:
         ptask = p.add(Node(t.name, duration=t.duration))
         if t.predecessors:
             for pred in t.predecessors.all():
                 p.link(ptask.name,pred.name)
     p.update_all()
     return p.get_critical_path()
Exemple #6
0
    def test_project(self):

        p = Node('project')

        a = p.add(Node('A', duration=3))
        b = p.add(Node('B', duration=3, lag=0))
        c = p.add(Node('C', duration=4, lag=0))
        d = p.add(Node('D', duration=6, lag=0))
        e = p.add(Node('E', duration=5, lag=0))

        p.link(a, b)
        p.link(a, c)
        p.link(a, d)
        p.link(b, e)
        p.link(c, e)
        p.link(d, e)

        p.update_all()

        #        for node in sorted(p.nodes, key=lambda n: n.name):
        #            node.print_times()

        self.assertEqual(a.es, 0)
        self.assertEqual(a.ef, 3)
        self.assertEqual(a.ls, 0)
        self.assertEqual(a.lf, 3)
        self.assertEqual(b.es, 3)
        self.assertEqual(b.ef, 6)
        self.assertEqual(b.ls, 6)
        self.assertEqual(b.lf, 9)
        self.assertEqual(c.es, 3)
        self.assertEqual(c.ef, 7)
        self.assertEqual(c.ls, 5)
        self.assertEqual(c.lf, 9)
        self.assertEqual(d.es, 3)
        self.assertEqual(d.ef, 9)
        self.assertEqual(d.ls, 3)
        self.assertEqual(d.lf, 9)
        self.assertEqual(e.es, 9)
        self.assertEqual(e.ef, 14)
        self.assertEqual(e.ls, 9)
        self.assertEqual(e.lf, 14)

        critical_path = p.get_critical_path()
        #print critical_path
        self.assertEqual(critical_path, [a, d, e])
        self.assertEqual(p.duration, 14)
        self.assertEqual(p.es, 0)
        self.assertEqual(p.ef, 14)
        self.assertEqual(p.ls, 0)
        self.assertEqual(p.lf, 14)
Exemple #7
0
    def test_project(self):

        p = Node('project')

        a = p.add(Node('A', duration=3))
        b = p.add(Node('B', duration=3, lag=0))
        c = p.add(Node('C', duration=4, lag=0))
        d = p.add(Node('D', duration=6, lag=0))
        e = p.add(Node('E', duration=5, lag=0))

        p.link(a, b)
        p.link(a, c)
        p.link(a, d)
        p.link(b, e)
        p.link(c, e)
        p.link(d, e)

        p.update_all()

#        for node in sorted(p.nodes, key=lambda n: n.name):
#            node.print_times()

        self.assertEqual(a.es, 0)
        self.assertEqual(a.ef, 3)
        self.assertEqual(a.ls, 0)
        self.assertEqual(a.lf, 3)
        self.assertEqual(b.es, 3)
        self.assertEqual(b.ef, 6)
        self.assertEqual(b.ls, 6)
        self.assertEqual(b.lf, 9)
        self.assertEqual(c.es, 3)
        self.assertEqual(c.ef, 7)
        self.assertEqual(c.ls, 5)
        self.assertEqual(c.lf, 9)
        self.assertEqual(d.es, 3)
        self.assertEqual(d.ef, 9)
        self.assertEqual(d.ls, 3)
        self.assertEqual(d.lf, 9)
        self.assertEqual(e.es, 9)
        self.assertEqual(e.ef, 14)
        self.assertEqual(e.ls, 9)
        self.assertEqual(e.lf, 14)

        critical_path = p.get_critical_path()
        #print critical_path
        self.assertEqual(critical_path, [a, d, e])
        self.assertEqual(p.duration, 14)
        self.assertEqual(p.es, 0)
        self.assertEqual(p.ef, 14)
        self.assertEqual(p.ls, 0)
        self.assertEqual(p.lf, 14)
Exemple #8
0
    def handle(self, root_job_id, **options):
        root_job = Job.objects.get(id=int(root_job_id))
        samples = int(options['samples'])

        # Add all system task nodes.
        system = Node('system')
        system.add(
            Node(root_job.id,
                 duration=root_job.get_run_length_estimate(samples=samples)))
        print('%s takes about %s seconds' \
            % (root_job, root_job.get_run_length_estimate(samples=samples)))
        chain = root_job.get_chained_jobs()
        for job in chain:
            print('%s takes about %s seconds' \
                % (job, job.get_run_length_estimate(samples=samples)))
            node = Node(job.id,
                        duration=job.get_run_length_estimate(samples=samples))
            node.description = job.name
            system.add(node)

        # Add all links between task nodes.
        print('-' * 80)
        for job in chain:
            if not job.enabled:
                continue
            dependees = JobDependency.objects.filter(dependent=job,
                                                     dependee__enabled=True)
            dependees = dependees.values_list('dependee_id', flat=True)
            print(job, dependees)
            for dependee in dependees:
                # Link dependent job to dependee.
                assert job.id != 1
                system.link(from_node=dependee, to_node=job.id)

        root_node = system.lookup_node(1)
        print('root_node:', root_node, root_node.to_nodes,
              root_node.incoming_nodes)
        system.add_exit()
        sys.stdout.flush()

        #return
        print('Updating values...')
        system.update_all()

        critical_path = system.get_critical_path()
        print('critical_path:', critical_path)
        system.print_times()

        print('min hours:', system.duration * (1 / 60.) * (1 / 60.))
Exemple #9
0
def CriticalPath(request,pk):
    context = {}
    project = get_object_or_404(Project, pk=pk)
    p = Node(project.name)
    task = Task.objects.all()
    for t in task:
        ptask = p.add(Node(t.name, duration=t.duration))
        if t.predecessors:
            for pred in t.predecessors.all():
                p.link(ptask.name,pred.name)
    p.update_all()
    context['criticalpath'] = p.get_critical_path()
    context['duration'] = p.duration
    context['name'] = p
    template = 'manage/criticalpath.html'
    return render_to_response(template, context, context_instance=RequestContext(request)
            ) 
Exemple #10
0
class Project:
    def __init__(self):
        self.p = Node('project')
        self.nodes = []

    def create_network(self, actions):
        for action in actions:
            self.nodes.append(self.p.add(Node(action.name, action.duration)))
        for action in actions:
            for pre in action.predecessors:
                self.p.link(pre, action.name)
        self.p.update_all()

    def get_critical_path(self):
        return self.p.get_critical_path()

    def get_duration(self):
        return self.p.duration
 def handle(self, root_job_id, **options):
     root_job = Job.objects.get(id=int(root_job_id))
     samples = int(options['samples'])
     
     # Add all system task nodes.
     system = Node('system')
     system.add(Node(root_job.id, duration=root_job.get_run_length_estimate(samples=samples)))
     print('%s takes about %s seconds' \
         % (root_job, root_job.get_run_length_estimate(samples=samples)))
     chain = root_job.get_chained_jobs()
     for job in chain:
         print('%s takes about %s seconds' \
             % (job, job.get_run_length_estimate(samples=samples)))
         node = Node(job.id, duration=job.get_run_length_estimate(samples=samples))
         node.description = job.name
         system.add(node)
     
     # Add all links between task nodes.
     print('-'*80)
     for job in chain:
         if not job.enabled:
             continue
         dependees = JobDependency.objects.filter(dependent=job, dependee__enabled=True)
         dependees = dependees.values_list('dependee_id', flat=True)
         print(job, dependees)
         for dependee in dependees:
             # Link dependent job to dependee.
             assert job.id != 1
             system.link(from_node=dependee, to_node=job.id)
     
     root_node = system.lookup_node(1)
     print('root_node:', root_node, root_node.to_nodes, root_node.incoming_nodes)
     system.add_exit()
     sys.stdout.flush()
     
     #return
     print('Updating values...')
     system.update_all()
     
     critical_path = system.get_critical_path()
     print('critical_path:', critical_path)
     system.print_times()
     
     print('min hours:', system.duration*(1/60.)*(1/60.))
Exemple #12
0
        #se capturan los nodos
        a = None
        b = str(i)
        duracion = int(input("Ingrese la duracion del nodo " + b + " :"))
        nodos.append(a)
        nodos[i] = p.add(Node(b, duration=duracion))

    print("ingrese las relacion por pares")
    print("Se termina con un espacio en blanco")
    while True:
        list = []
        valor1 = input()
        if valor1 == "":
            break
        valor2 = input()
        valor1 = int(valor1)
        valor2 = int(valor2)
        list.append(nodos[valor1])
        list.append(nodos[valor2])
        list = tuple(list)
        links.append(list)
        print()

    for link in links:
        p.link(*link)

    p.update_all()

    print(p.get_critical_path())
    print(p.duration)
def create_function(combination,Res,BindAvail):
    combinations=copy.copy(combination)
    #**********new combination processing*********
    Qout={}
    j=1
    #create the ordering graph
    executable=True
    pred2=''
    predecessors=[]
    valeurs = []
    namep=str("projet")
    p = Node(namep)
    l={}
    while len(combination) > 0 and not BindAvail < Res:
        Exec=[]
        #determine the set of data services which can be executed at iteration i(i.e.,all its required inputs are available)
        for servic in combination:
            for ser in Service_lake:
                if ser.ide==servic:
                    service=ser
            if set(service.inputs).issubset(BindAvail):
                Exec.append(service)
        if not Exec:
            executable=False
        else:
            for service in Exec:
                l[str(service.ide)]=p.add(Node(str(service.ide), duration=int(service.response_time),lag=0))
                predd='"'
                pred2=pred2+service.name+' '+str(service.response_time)+' '
                if len(predecessors)>1:
                    for pr in predecessors:
                        for service1 in Service_lake:
                            if service1.name==pr:
                                p.link(l[str(service.ide)],l[str(service1.ide)])
                                predd=predd+str(service1.ide)+','
                                pred2=pred2+str(service1.name)+' '
                    Index=len(predd)-1
                    Name_list = list(predd)
                    Name_list[Index] = '"'
                    predd = "".join(Name_list)
                elif len(predecessors)==1:
                    for service1 in Service_lake:
                        if service1==predecessors[0]:
                            p.link(l[str(service.ide)],l[str(service1.ide)])
                            predd=str(service1.ide)
                            pred2=pred2+str(service1.name)+' '
                if predd=='"':
                   predd=''
                valeurs.append([str(service.ide),service.name,str(service.response_time),predd,str(0)])
                pred2=pred2+str("\n ")
                for out in service.outputs:
                    BindAvail.add(out)
                #check here the content of BindAvail
                combination.remove(service.ide)
        predecessors=[]
        for service in Exec:
            predecessors.append(service)
    if executable:        
        #!!! identify the critical path for a plan P, elapsed time and critical services !!! 
        p.update_all()
        s=p.get_critical_path()
        t=p.duration
        P=Plan(combinations,pred2,s,t)
        Plans.append(P)
        ii=P.ide
        file=str("Plans/"+"ExecutableOrdering"+str(ii)+".csv")
        f = open(file, 'w')
        ligneEntete = ",".join(entetes) + "\n"
        f.write(ligneEntete)
        n=0
        for valeur in valeurs:
            ligne = ",".join(valeur) + "\n"
            f.write(ligne)
            n+=1
        f.close()
        df = pd.read_csv("Plans/"+"ExecutableOrdering"+str(ii)+".csv")
        for i in range(0,n):
            for servic in P.incl_services:
                if df.at[i,"id"]==servic:
                    for ser in Service_lake:
                        if ser.ide==servic:
                            service=ser
                    p=calls_number(service,str("Plans/"+"ExecutableOrdering"+str(ii)+".csv"))
                    df.at[i, "critical"]= 1
                    df.at[i,"calls_number"]=p
        df.to_csv("Plans/"+"ExecutableOrdering"+str(ii)+".csv", index=False)
        P.Ordering_file=file
    else:
        print("this plan is not executable")
    return P,executable